The Missouri Pw 2 form is a crucial document for contractors working on public works projects in the state of Missouri, requiring detailed project and contractor information according to Sections 290.210 through 290.340 and 290.550 through 290.580 of the Revised Statutes of Missouri. It ensures compliance with laws mandating the payment of prevailing wages to workers, outlining project details such as cost, location, anticipated timelines, and contractor information. For those seeking to fulfill their responsibilities and comply with state regulations, ensuring the form is filled out accurately and submitted properly is paramount.

For guidance on filling out the form correctly or to complete your submission, click the button below.

Access Editor Now
Jump Links

For those embarking on public works projects in Missouri, understanding the requirements set forth by the state's Department of Labor and Industrial Relations is crucial. The Missouri Prevailing Wage Project Notification, known as the PW-2 form, stands as a pivotal document in the pre-construction phase. This comprehensive form is designed to gather essential information from contractors about the project at hand, aligning with Missouri's Revised Statutes Sections 290.210 through 290.340 and 290.550 through 290.580. Key aspects of the form cover the date of notification, inclusion of the annual wage order in bid specifications, a descriptive name of the project, and detailed financial estimates including the anticipated total construction costs. Additionally, it requires precise location details, identification of the public body or agency overseeing the project, contact information, and timelines for critical milestones such as advertising for bids, awarding contracts, project commencement, and completion. A vital component of the form is determining whether federal funds will be used, affecting compliance with certain regulations. Contractor information, though optional, can also be included, encompassing general contractors and subcontractors involved in the project. Filing the PW-2 form is not just a procedural step; it ensures adherence to Missouri's prevailing wage laws, intended to protect workers and ensure fair compensation on public works projects. For public bodies, meticulous completion and submission of this form to the Division of Labor Standards mark a fundamental obligation, underscoring their responsibility in upholding labor standards within the state.

Preview - Missouri Pw 2 Form

MISSOURI DEPARTMENT OF LABOR AND INDUSTRIAL RELATIONS

DIVISION OF LABOR STANDARDS

PREVAILING WAGE

PROJECT NOTIFICATION – CONTRACTOR INFORMATION NOTIFICATION

The information below is requested pursuant to Sections 290.210 through 290.340 and 290.550 through 290.580

REVISED STATUTES OF MISSOURI.

1.

Date of Notification

 

2. Annual Wage Order No. Included in Bid Specifications

 

 

 

 

 

3.

Popular or Descriptive Name of Project

 

 

 

 

 

 

 

 

4.

Estimated Project Cost of Completion

 

 

 

 

(total construction contracts to be awarded)

$

 

 

 

 

 

5.

Exact Location of Project *Specify Name of 1County and 2City, Village or District

 

County

City or Village

 

Township

 

 

 

 

 

6.

Official Name of Public Body or Agency

 

 

 

 

 

 

 

 

7.

Name of Contact Person

 

 

8. Phone Number (include area code)

 

 

 

 

 

9.

Address

 

 

 

10.

E-mail Address

Website

 

 

 

 

 

11.

Anticipated Date for Soliciting or Advertising for Bids

12.

Anticipated Date for Contract Awarding

 

 

 

 

13.

Proposed Date for Start of Work on Project

14.

Estimated Date of Project Completion

 

 

 

 

15.

Will There Be Any Federal Funds Used in this Contract?

Yes

No

 

 

 

16.

Contractor Information Notification (Optional, please provide if available.)

 

General Contractor: Name

Address

 

 

 

 

 

City

 

 

State

 

Zip

 

List all Sub-Contractors:

 

 

 

 

 

Name

 

 

 

 

 

 

Address

 

 

 

 

 

City

 

 

State

 

Zip

 

Name

 

 

 

 

 

 

Address

 

 

 

 

 

City

 

 

State

 

Zip

 

The state of Missouri requires workers on public works projects be paid prevailing wage. Public bodies have certain duties required to fulfill under this law (Section 290.210 - 290.340 RSMo).

Mail, Fax or E-mail completed form to:

DIVISION OF LABOR STANDARDS

Attn: Prevailing Wage Section

P.O. Box 449

Jefferson City, MO 65102-0449

Phone: 573-751-3403

Fax: 573-751-3721

E-mail: prevailingwage@dolir.mo.gov

Website: www.dolir.mo.gov/ls

PW-2 (04-06) AI

File Properties

The completed form should be mailed, faxed, or emailed to the Division of Labor Standards, specifically to the Prevailing Wage Section, as part of the compliance process.
Fact Name Description
Purpose of PW-2 Form The form serves as a notification by contractors on public works projects in Missouri, informing about contractor details and project specifics according to state law.
Governing Law Sections 290.210 through 290.340 and 290.550 through 290.580 of the Revised Statutes of Missouri make the submission of this form a requirement for certain projects.
Information Required The form requests detailed project information, including dates pertinent to the bidding and construction phases, contractor information (both general and subcontractors), and financial aspects like estimated project cost.
Prevailing Wage Compliance It is instrumental in ensuring compliance with Missouri's prevailing wage laws, which mandate that workers on public works projects receive the prevailing local wage for their labor.
Submission Details

How to Fill Out Missouri Pw 2

Completing the Missouri PW-2 form is a vital step for contractors engaging with public works projects in Missouri. This form is structured to gather specific details necessary to comply with Missouri's prevailing wage laws. The following instructions are designed to guide stakeholders through the process of accurately filling out this document, ensuring that all relevant data is thoroughly and correctly provided, which in turn facilitates compliance with state regulations.

  1. Enter the Date of Notification in the space provided for item 1.
  2. For item 2, include the Annual Wage Order No. that was included in the bid specifications.
  3. Provide the Popular or Descriptive Name of Project in the field for item 3, ensuring it matches official documentation.
  4. In item 4, enter the Estimated Project Cost of Completion, including total figures for all construction contracts to be awarded.
  5. Under item 5, specify the Exact Location of the Project, outlining the Name of the County and City, Village, or District as requested.
  6. Item 6 asks for the Official Name of the Public Body or Agency overseeing the project; fill this out entirely.
  7. Provide the Name of the Contact Person along with their Phone Number (including area code) in items 7 and 8, respectively.
  8. For item 9, give the Address, followed by the E-mail Address and Website in item 10, ensuring accurate contact information.
  9. Indicate the Anticipated Date for Soliciting or Advertising for Bids in item 11 and the Anticipated Date for Contract Awarding in item 12.
  10. The Proposed Date for Start of Work on Project and the Estimated Date of Project Completion are to be filled out in items 13 and 14, outlining the project timeline.
  11. Answer Yes or No to whether federal funds will be used in the contract, in item 15.
  12. For item 16, if applicable, provide the General Contractor Information, including Name and Address, followed by the List of all Sub-Contractors with their respective Names and Addresses.

Upon completion, the form should be reviewed for accuracy and completeness. It should then be submitted to the Division of Labor Standards through the specified mail, fax, or email address. This submission is crucial for ensuring adherence to prevailing wage laws, which safeguard fair labor practices within the state. It's a step that underscores a commitment to equitable and law-abiding project management and execution.

Understanding Missouri Pw 2

FAQs about the Missouri PW-2 Form

What is the purpose of the Missouri PW-2 form?

The Missouri PW-2 form, or Prevailing Wage Project Notification – Contractor Information Notification, is designed to collect essential information about public works projects in Missouri. It helps ensure that workers are paid the prevailing wage, as required by the Revised Statutes of Missouri, Sections 290.210 through 290.340 and 290.550 through 290.580. By providing project and contractor details, it allows the Division of Labor Standards to enforce compliance with these laws.

Who is required to submit the Missouri PW-2 form?

Any public body or agency undertaking a public works project in Missouri is required to submit the Missouri PW-2 form. This includes projects that are directly managed by public entities or those funded in whole or in part by public funds. The form requires information on both the general contractor and any subcontractors involved in the project.

What details must be provided on the Missouri PW-2 form?

The Missouri PW-2 form requires the following information:

  1. Date of Notification
  2. Annual Wage Order No. Included in Bid Specifications
  3. Popular or Descriptive Name of Project
  4. Estimated Project Cost of Completion
  5. Exact Location of Project
  6. Official Name of Public Body or Agency
  7. Name of Contact Person
  8. Phone Number
  9. Address
  10. E-mail Address
  11. Anticipated Dates for Soliciting or Advertising for Bids, Awarding Contracts, Starting Work, and Completing the Project
  12. Utilization of Federal Funds
  13. General Contractor and Sub-Contractors Information

How and where do I submit the Missouri PW-2 form?

The completed Missouri PW-2 form should be submitted to the Division of Labor Standards. It can be sent either via mail, fax, or email to the following addresses:

  • Mail: Attn: Prevailing Wage Section, P.O. Box 449, Jefferson City, MO 65102-0449
  • Fax: 573-751-3721
  • E-mail: prevailingwage@dolir.mo.gov

Is it mandatory to include information on subcontractors in the Missouri PW-2 form?

While the form states that the subcontractor information is optional, providing it is highly encouraged to ensure compliance with prevailing wage laws. Listing all subcontractors involved in the public works project helps the Division of Labor Standards monitor and enforce the proper payment of wages as per Missouri law.

Common mistakes

Filling out the Missouri Pw 2 form correctly is crucial for compliance with state requirements on public works projects. However, mistakes can easily occur if one is not careful. Avoiding these common errors can save individuals and organizations a significant amount of time and resources.

  1. Failing to include the Date of Notification: The form starts with the necessity to report the date when the notification is being made. Overlooking this detail can lead to processing delays.
  2. Not specifying the Annual Wage Order No.: This number is essential for identifying the applicable wage order for the project. Incorrect or missing information here can result in non-compliance with wage regulations.
  3. Omitting the Project's Popular or Descriptive Name: This helps in identifying the project more easily throughout the documentation process. Skipping this step might cause confusion or misidentification later on.
  4. Underestimating the Project Cost: Accurately reporting the estimated total construction contracts is required. Underestimation could reflect poorly on the responsible parties and lead to legal complications.
  5. Not being specific about the Location of the Project: The form requires details such as the county, city, village, or township. Vagueness in these details can lead to misunderstandings regarding the project’s actual site.
  6. Incomplete Contact Information of the Public Body or Agency: Providing comprehensive contact details, including the name of the contact person and their phone number, is crucial for clear communication. Failure to provide thorough information might hinder coordination.
  7. Leaving out the Anticipated Dates: Information regarding the solicitation for bids, contract awarding, start of work, and project completion is critical for the prevailing wage notification process. Missing dates can delay project timelines.
  8. Ignoring the Federal Funds question: It is mandatory to disclose whether the project will utilize federal funds. Not addressing this question can result in non-compliance with both state and federal laws.
  9. Omission of Contractor Information: While listing the general and sub-contractors is optional, providing this information aids in the transparency and accountability of the project. Excluding this data could lead to missed opportunities for oversight.

Here are some additional recommendations for filling out the form:

  • Double-check all entered information for accuracy before submission.
  • Ensure all mandatory fields are completed; do not leave any section blank unless it is specified as optional.
  • Contact the Division of Labor Standards directly if clarification is needed on any part of the form or its requirements.

Ultimately, the key to successfully completing the Missouri Pw 2 form lies in attention to detail and a thorough understanding of the project's specifics. Taking the time to review and confirm all information can prevent unnecessary errors and ensure compliance with Missouri's prevailing wage laws.

Documents used along the form

When managing a construction project in Missouri, particularly those involving public works that require adherence to prevailing wage laws, the PW-2 form plays a crucial role. However, this form often works in tandem with a suite of other documents that support various aspects of project administration, compliance, and execution. The documents listed below are typically used alongside the PW-2 form to ensure that all legal, financial, and operational requirements are met.

  • Annual Wage Order: Issued by the Missouri Department of Labor, this document details the prevailing wage rates for various types of labor and trades specific to the county where the project is taking place. It is essential for compliance with state wage laws.
  • Contractor's Affidavit of Payment of Debts and Claims: This affidavit confirms that the contractor has paid all debts and claims related to labor and materials for the project. It's crucial for closing out projects.
  • Employee's Claim for Wage Loss Benefits form: Workers who believe they have not been paid the prevailing wages may use this form to file a claim with the Missouri Department of Labor.
  • Statement of Compliance: This document, certified by the contractor, affirms that the wages paid to workers on the project align with the prevailing wage rates. It's often required for project audits and compliance checks.
  • Public Works Contract Award Notification Form: Used by public bodies to notify the Missouri Department of Labor about the award of a public works contract, ensuring that the project is registered and monitored for compliance.
  • Weekly Certified Payroll Report: Contractors must submit these reports weekly, detailing the wages paid to each worker. It is a critical component of prevailing wage compliance verification.
  • Work Authorization/Verification Form: Employers use this form to verify that all employees are legally authorized to work in the United States, aligning with federal and state labor laws.
  • Notice to Proceed: Issued by the project manager or public body, this document officially authorizes the start of construction work on the project site.
  • Change Order Forms: These are used to document any changes to the scope of work, including adjustments in project cost, and are essential for financial tracking and compliance.
  • Project Completion Report: A final report summarizing the project's scope, including any deviations from the original plan, final costs, and compliance with prevailing wage and other labor laws.

Together, these documents create a comprehensive framework for managing public works projects in Missouri, from ensuring fair wages and compliance with labor laws to documenting project progression and final outcomes. Effective management of these documents supports not only legal compliance but also transparency and accountability throughout the project lifecycle.

Similar forms

The Missouri PW-2 form, used for prevailing wage project notifications, has similarities with several other legal documents, primarily due to its function in the construction and labor sectors. These documents typically serve for regulatory compliance, project management, or labor standards enforcement. A closer look at each will highlight their distinct parallel objectives while underlining their specific features.

The Federal Davis-Bacon Act forms are among the closest relatives to the Missouri PW-2 form. They both request detailed information on construction projects, including contractor and subcontractor details, but with a focus on ensuring workers on federal public works projects are paid no less than the locally prevailing wages and benefits. While the Davis-Bacon Act forms serve a federal purpose, the Missouri PW-2 form's use is state-specific, yet their core objective of safeguarding fair labor standards aligns them closely.

Contractor's Certified Payroll forms also share a notable similarity with the Missouri PW-2 form. These forms are pivotal in complying with the documentation and reporting requirements set forth by prevailing wage laws. They require the contractor to report wages paid to workers weekly, ensuring compliance with the prevailing wage regulations. The key difference lies in the frequency and detail of wage reporting, with certified payroll focusing more on the individual worker's earnings and the PW-2 providing a project overview.

Statement of Intent to Pay Prevailing Wages forms, commonly required in states with prevailing wage laws, are another document type akin to the Missouri PW-2 form. These documents are typically submitted by contractors before starting work on a public project, declaring their intention to pay the appropriate prevailing wages. Like the Missouri PW-2, these forms play a crucial role in the pre-project phase, serving as a formal commitment to adhere to state-enforced labor standards. However, the Statement of Intent is more a pledge of future action, whereas the PW-2 form is a notification providing details about the project and its stakeholders.

Dos and Don'ts

When it comes to filling out the Missouri PW-2 form, it's essential to pay close attention to details to ensure compliance with Missouri's prevailing wage requirements. Here are eight crucial dos and don'ts to guide you through the process:

Dos:

  1. Double-check the date of notification to make sure it's correct.

  2. Include the Annual Wage Order No. in the bid specifications as requested.

  3. Provide a clear and accurate popular or descriptive name of the project to avoid any confusion.

  4. Ensure the estimated project cost of completion is accurate. Double-check the total construction contracts to be awarded.

  5. Specify the exact location of the project, including the name of the county and city, village, or district, to prevent any location-related errors.

  6. Include the official name of the public body or agency overseeing the project for proper identification.

  7. Ensure the contact person's information is up to date, including phone number and e-mail address.

  8. Indicate whether federal funds will be used in the contract by accurately answering yes or no.

Don'ts:

  • Don't leave any requested fields blank. Incomplete information can lead to processing delays or form rejection.

  • Avoid guessing the Annual Wage Order No.; ensure it's verified before inclusion.

  • Don't provide vague project names. The name should be descriptive enough to identify the project easily.

  • Avoid estimating the project cost without proper validation. Inaccuracies could impact contractual obligations.

  • Don't provide a general location. The exact location is critical for legal and administrative reasons.

  • Avoid listing an outdated or incorrect contact person. This could result in communication issues.

  • Don't forget to check the box indicating whether federal funds are involved, as this affects prevailing wage calculations.

  • Avoid submitting the form without verifying all the provided information. Accuracy is key to avoid complications.

By adhering to these dos and don'ts, filling out the Missouri PW-2 form can be a smooth process that ensures compliance with Missouri's prevailing wage laws.

Misconceptions

When discussing the Missouri PW-2 form, used for prevailing wage project notifications, several misconceptions are commonly encountered. Understanding the intricacies of this document is imperative for contractors working on public works projects. Here, we aim to elucidate these misconceptions for better compliance and awareness.

  • It's only for general contractors: A common misconception is that the Missouri PW-2 form is exclusively for general contractors. However, it must be submitted by any contractor or public body that is overseeing a public works project, ensuring all involved parties are aware of the prevailing wage requirements.

  • Federal projects are exempt: There's a belief that projects receiving federal funding are not subject to Missouri's prevailing wage laws. While federal projects have their own prevailing wage standards (Davis-Bacon Act), the PW-2 form still requires indication of any federal funds, as Missouri law may apply in certain contexts.

  • Submission is at project completion: Another mistake is thinking the form is to be submitted upon project completion. Instead, it should be submitted at the beginning stages, specifically during the soliciting or advertising for bids, to ensure compliance from the outset.

  • Completion dates are optional: Some contractors might consider estimated start and completion dates optional on the PW-2 form. These dates are crucial for the Missouri Department of Labor to monitor the project's adherence to prevailing wage laws throughout its duration.

  • Contact information is only for internal use: The provided contact information is not just for the Missouri Department of Labor's records. It is essential for facilitating communication regarding compliance issues or clarifications throughout the project.

  • Submission by mail is the only way: While mailing is a valid submission method, the form can also be submitted via fax or email. This flexibility helps in speeding up the process and ensuring timely compliance.

  • List of subcontractors is optional: Including a list of all subcontractors is seen by some as unnecessary. However, providing this list is critical to ensure all parties on a project are aware of and are complying with prevailing wage requirements.

  • Annual Wage Order No. is not crucial: The Annual Wage Order Number is sometimes overlooked but is essential for identifying the specific prevailing wage rates applicable to the project. This helps in maintaining standardization and fairness across public works projects.

Correcting these misunderstandings ensures that contractors and public bodies can better adhere to Missouri's prevailing wage laws. Compliance not only fosters fair labor practices but also promotes equitable economic growth across the state's industries.

Key takeaways

Filling out and properly using the Missouri PW-2 Form is essential for compliance with Missouri's prevailing wage laws. Here are ten key takeaways related to the process:

  1. The Missouri PW-2 Form serves as a notification by contractors to the Missouri Department of Labor and Industrial Relations about a public works project, ensuring adherence to the state's prevailing wage requirements.
  2. Sections 290.210 through 290.340 and 290.550 through 290.580 of the Revised Statutes of Missouri necessitate the submission of this form, emphasizing its legal importance.
  3. It is crucial to report the Date of Notification accurately, as this establishes the timeline for compliance and monitoring by the Division of Labor Standards.
  4. Understanding and including the Annual Wage Order No. is significant, as this number directly correlates with the prevailing wage rates applicable to the project.
  5. Providing a clear, Popular or Descriptive Name of the Project helps in identifying the specific undertaking and facilitates better communication and record-keeping.
  6. The Estimated Project Cost of Completion must reflect all construction contracts to be awarded, ensuring a complete financial overview of the project is presented.
  7. Specifying the Exact Location of the Project, including County, City, Village, or District, is mandatory for jurisdictional clarity and compliance verification.
  8. Identifying the Official Name of the Public Body or Agency, along with the Contact Person’s Name, Phone Number, and Email, is crucial for establishing a point of communication.
  9. Timelines for Soliciting or Advertising for Bids, Contract Awarding, Start of Work, and Estimated Completion Date are all required to monitor compliance throughout the project’s lifecycle.
  10. The inquiry whether Federal Funds are being used underlines the necessity of understanding how the source of funds may affect wage requirements.
  11. Including optional Contractor Information, such as the General Contractor and any Sub-Contractors, promotes transparency and accountability in adhering to prevailing wage laws.

Correctly completing and submitting the Missouri PW-2 Form is not only a legal obligation but also a critical step in ensuring fair wages for workers on public projects. It is advised to consult the form instructions carefully and reach out to the Division of Labor Standards for any clarification.

Please rate Blank Missouri Pw 2 Template Form
4.69
(Incredible)
177 Votes